DISTANCE BETWEEN PUSHING POINTS
FEM
ROLLER GUIDES
LINK LEVER
3D PROJECT
BRIDGE MEASURING CENTRE

DETAILS

 

DISTANCE BETWEEN PUSHING POINTS

The maximum distance between the pushing points allows the press to support displaced loads and give more freedom to the project and positioning of the tools.
At the same time reduces the frame deflection due to displaced loads (always present in progressive works) to keep repeatability in time Link Lever reaction frame supports are positioned on the shoulders line

The rap pin connection allows to reduce the unwanted loads on the regulation screws.

This guarantees high rigidity of the ram, reducing the deplection due to displaced loads.